Tesla would cover the costs of installing the eight charging stations at Kirk Park Beach, which would take between three and six weeks to complete, and cost a total of about $500,000.
The current hotel can be expanded, or there’s the possibility of converting the hotel to co-op units. The downside to the property is that it’s not as privately located as other oceanfront resorts in Montauk.